+218 (0) 21 4841 552 / 3Palm city residence is a European real estate investment project lays on a total area of 17 hectares with approximate covered area of 100,000 m2 including( 374 residential units, Restaurant , sport center, Commercial Center, supermarket and 2 apart. hotel multi story buildings.
Tasks:
Carry out All the earth and structure works for the project, including (the Construction of Sea walls, wave breakers, trenching works for the infrastructure networks and installations works). The works included the preparation of accommodation camp units of prefabricated building for 400 Persons in site including a kitchen and related facilities.
The project is a real estate development on a land plot of 17,575 sqm in the neighborhood of Janzour, which lies 16 km west of the heart of the capital, Tripoli. The development comprises of residential compound with retail space
Tasks:
Carry out Construction and Completion of Commercial and administrative building consists of 6 stories and underground car parking. Project total covered area 7,000 sqm
Re modeling of a 6 stories existing Concrete structure building to fit a 4 stars hotel international standards and adding 2 extra stories to be with approximate covered area of 3,500 sqm.
Tasks:
Carry out Engineering study (Phase 1) Remodeling a 6story concrete structure to fit 4 Stars Hotel including the study to add the new bearing walls and partitions Interior and exterior finishing works - Mechanical works including the ACworks, Electrical works including the high and low voltage current Interior decoration and Land escape works.
A private hotel which lays on a land of 2,500 sqm with 3 exterior facades (One direct to sea view) in Girgarish neighborhood in Tripoli city, the building ( 6 stories and a basement) with a total covered area of 5,300 sqm
Tasks:
Carry out Construction of the Concrete structure of 6 story and basement with total coverage area of 5,300 sqm.
Tripoli West Power Plant Earth works for the Extension of power plant “ C” (2 x 325 Mw).
Tasks:
Excavating 323,500 m3 of deferent types of soil and transporting all the quantity to the public dumping area.
Supply of Equipment\ Materials and Maintenance Services
Tasks:
Supplying of equipment for offshore and onshore oil fields and site fields – pipe lines work – electromechanical services.
General Maintenance for 2 cooling units at Surman harbor and units structure repair
Tasks:
Carry out Electromechanical maintenance for Sorman city harbor΄s cooling units system and supply of spare parts \ Sandwich wall repair and replacement..
Construction and laying of Infrastructure facilities for Souk Alalga Sabrata City of Libya
Tasks:
Carry out Construction and laying of Infrastructure facilities for a residential community of 8,000 population including the main pipe for the pumping station \ 8 Km
Maintenance of the production lines of producing bricks and pretension concrete beams.
Tasks:
Carry out Electro mechanical maintenance works for bricks and concrete beams production line including supplying of spare parts, collaboration and commissioning.
Construction and Competition of 4 adminstrative buildings in various locations in Libya.
Tasks:
Carry out Construction and finishing works for 4 buildings in various locations in Libya.
10 electrical substations of 11 KVA each.
Tasks:
Carry out Construction and Competition works for 10 Substations of 11 KV each in various locations in Libya.
Prefabricated Metal Units For Varoius Use
Tasks:
Civil Works\ Metal Works\ Electromechanical Works
General Rehabilitation and Modifications
Tasks:
Civil Works\ Metal Works\ Electromechanical Works
Rehabilitation Of Two Schools in Misratah - Libya
Tasks:
Civil Works\ Metal Works\ Electromechanical Works